Sign In | Join Free | My howtoaddlikebutton.com
China Qingdao Ruly Steel Engineering Co.,Ltd logo
Qingdao Ruly Steel Engineering Co.,Ltd
One-stop service for steel structure project
Verified Supplier

7 Years

Home > Steel Structure Warehouse >

SGS Hot Dip Galvanized Stable Prefabricated Steel Warehouse

Qingdao Ruly Steel Engineering Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

SGS Hot Dip Galvanized Stable Prefabricated Steel Warehouse

  • 1
  • 2

Brand Name : Ruly Steel

Model Number : Ruly0241

Certification : SGS, BV, ISO

Place of Origin : China

MOQ : 300 Square Meter

Payment Terms : L/C, T/T, Western Union

Supply Ability : 20000 Square Meter Per Month

Delivery Time : 15 ~ 20 Days

Packaging Details : As request

Application : Light Steel Structure Warehouse

Features : Galvanized Metal Buildings

Type : Steel Structure Warehouse

Working scope : Design,Fabrication, Installation

Raw steel material : Q235B, Q355B, ASTM A36

Service life : 50 Years

Wall and Roof : Steel cladding sheet

Surface treatment : Painting

Contact Now

Environmentally Friendly And Stable Prefabricated Steel Warehouse

Construction Design Prefabricated Steel Structure Warehouse With Low Cost

Steel structure warehouse is a new type of building structure system, which is formed by the main steel framework linking up H section, Z section and U section steel components, roof and walls using a variety of sandwich panels or corrugated steel color sheet and other components such as windows and doors. It can be single span, multiple spans, and multiple stories with different using purpose. Steel structure warehouse is widely used for storage, logistic center, distribution center, etc… As a new type of steel building system, steel structure warehouse has the following advantages:

1. Environmental friendly and energy conversing;
2. Fast construction and easy erection;
3. Wide span can be 60m without middle columns;
4. Long life span up to 50 years;
5. Stable and earth quake proof up to 9 points.

SGS Hot Dip Galvanized Stable Prefabricated Steel Warehouse

SPECIFICATION OF STEEL STRUCTURE MATERIAL:

Item name Specification Material Parameter Technical Treatment
Column H shape,Box,steel pipe,Hot rolled sheet Q235B,Q345B Paint or Hot dip galvanized
Beam H shape,steel Truss,Hot rolled sheet Q235B,Q345B Paint or Hot dip galvanized
Bracing Steel rod,Steel pipe,Angle steel Q235B,Q345B
Purling C or Z shape, purling Thickness:1.8mm~3.0mm Q235B,Q346B Hot dip galvanized
Wall and roof panel EPS,Rock wool,Pu,Glass wool Sandwich panel or Single sheet. Steel T=0.426~0.8mm,insulation T=50~150mm Alu-zinc 150g, Fluorocarbon paint
Door Sliding or rolling door Steel or Aluminum sheet,T=1.0~1.5mm Paint or Hot dip galvanized
Window alloy-Glass,Aluminium alloy-shutter T=1.0~2.0mm Alloy
Lighting panel FRP, T=1.5mm or T=1.8mm Coefficient of thermal expansion:2.2x10-5/cm/cm/℃ Light transmittance 85%
Ventilator Turbine ventilator, and electric type Steel,stainless steel,PC Paint or Hot dip galvanized,304
Gutter Galvanized or stainless steel plate T=2.0mm Hot dip galvanized,304
Downpipe PVC pipe,Color steel pipe T=0.5mm Φ110,160,200 Paint
Bolt Ordinary, high strength 10.9S,4.8s Hot dip galvanized
Anchor bolt Steel rod M24,M27 M30 Q235B

OUR STEEL STRUCTURE FACTORY:

The floor space of our steel structure fabrication factory is 35,000㎡, and the workshop area is 20000㎡. We own three light/heavy H steel production lines, BOX production lines, C/Z purlin production lines and various types of profiling steel sheet machines with advanced equipment such as plasma cutting machine.

SGS Hot Dip Galvanized Stable Prefabricated Steel Warehouse

Sinoacme steel structure production procedure:

Design: The design will be made with full design parameters provided by clients;
Material: Raw material will be prepared according to the material list provided by engineers;
Cutting: Steel plate will be cut according to the detailed drawing provided by engineers;
Assembling: Apply spot welding to assemble two pieces flange plate and one web plate together;
Auto welding: Arc-submerging machine will be applied to make full welding for steel components;
Straightening: To make the deformation of flange and web plate to flat;
Manual welding: Welding the connection plate and purlin plate to the main steel components;
Shot blasting: To get rid of rust on the surface of steel components;
Painting: Antiseptic treatment;
Delivery: Packing, loading and deliver to construction site;
Erection: Erect according to the erection drawing provided by engineers;
Finishing: Whole project completed.

OUR SERVICE:

OEM&ODM Service, We can quote according to your drawings
Pre-Sales Service 1.Consultant service (Answering client's questions)
2.Primary design plan(Free)
3.Assisting client to choose suitable construction plan
4.Price calculation
5.Business&technology discussion
Sale Service 1.Submission of support reaction data for foundation
2.Submission of construction drawing
3.Providing requirements for embedding
4Construction Manual
5.Fabrication & Packing
6.Statistical table of material
7.Delivery on time
8.Other requirements by Clients
After-Sale Service 1.Service of installation Supervision
2.Instruction for using after installation completed


Product Tags:

Hot dip Prefabricated Steel Warehouse

      

Stable Prefabricated Steel Warehouse

      

SGS Industrial Steel Frame Buildings

      
Wholesale SGS Hot Dip Galvanized Stable Prefabricated Steel Warehouse from china suppliers

SGS Hot Dip Galvanized Stable Prefabricated Steel Warehouse Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Qingdao Ruly Steel Engineering Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0